摘要: |
指出城镇污水处理厂总量减排存在的问题,提出从水量核查、水质核查和运行状况核查等3方面对城镇污水处理厂现场核查,以此对城镇污水处理厂COD减排进行核算。 |
关键词: 核查要点 总量减排 城镇污水处理厂 |
DOI: |
分类号: |
基金项目: |
|
The Problem of Total Emission Reduction of Urban Wastewater Treatment Plant and the Key Point Analysis of On-site Verification |
|
Abstract: |
Pointed out the problem of the total emission reduction of urban wastewater treatment plant,and put forward to proceed the on-site verification from three aspects such as spot checking of the water quantity,the checking of water quality and the operation status.Finally checked the COD emisssion reduction of wastewater treatment factory according to these. |
Key words: improtant checking point total emission reduction urban wastewater treatment plant |