引用本文:俞美香,俞双双.浅论新时期建设项目竣工环境保护验收监测工作[J].环境监控与预警,2018,10(6):60-62
YU Mei xiang,YU Shuang shuang.Discussion on the Monitoring of Environmental Protection for the Completed Construction Projects under the New Situation[J].Environmental Monitoring and Forewarning,2018,10(6):60-62
【打印本页】   【HTML】   【下载PDF全文】   查看/发表评论  【EndNote】   【RefMan】   【BibTex】
←前一篇|后一篇→ 过刊浏览    高级检索
本文已被:浏览 8426次   下载 2716 本文二维码信息
码上扫一扫!
分享到: 微信 更多
浅论新时期建设项目竣工环境保护验收监测工作
俞美香,俞双双1,2
1. 江苏省环境监测中心,江苏 南京 210036;2. 苏交科环境与健康检测研究院江苏有限公司,江苏 南京 211112
摘要:
简述了建设项目竣工环境保护验收监测工作的发展历程,指出,《建设项目环境保护管理条例》(中华人民共和国国务院第682号令)的修订,对验收责任主体、验收行政许可、验收期限、验收监测单位及人员资质和验收信息公开等方面做出了新要求。提出,应以《建设项目竣工环境保护验收技术指南 污染影响类》为依据,做好验收监测方案编制、工况记录和报告编写等方面的工作,确保验收报告内容全面、准确,为项目验收提供有力的技术支撑和保障。
关键词:  环境保护  验收监测  技术要点
DOI:
分类号:X83;X32
文献标识码:C
基金项目:制定《建设项目竣工环境保护验收技术规范 橡胶和塑料制品业》基金资助项目(2018WRYS-JCZN-02)
Discussion on the Monitoring of Environmental Protection for the Completed Construction Projects under the New Situation
YU Mei xiang,YU Shuang shuang1,2
1. Jiangsu Environmental Monitoring Center,Nanjing,Jiangsu 210036,China;2. Su Jiao Ke Environmental and Health Testing Institute Jiangsu Co. Ltd.,Nanjing,Jiangsu 211112,China
Abstract:
This paper reviewed the development of the checking & acceptance monitoring of construction projects. The revision of “Environment Protection Administration Regulations for construction project” (Decree of State Council of the PRC, No.682)proposed new request for checking and acceptance from the aspects as are responsibility body, administrative permit, time limit, qualification of monitoring agency and personnel, and so on. In order to provide technical support and guarantee for the checking & acceptance of projects, we should get ready for monitoring programming, work condition recording, reporting and so on, based on 〖JP3〗“Technical Guideline for Checking & Accepting Environmental Protection Facilities in Completed Contaminative Construction Projects”.
Key words:  Environmental protection  Checking & acceptance monitoring  Technical key points