摘要: |
近年来,太湖蓝藻水华问题日趋严峻,除藻技术是解决该问题最直接而有效的手段,对现有各类除藻技术进行了比较,并以“加压上浮法”应急除藻技术在苏州阳澄湖局部地区的示范工程为例,介绍了该方法的技术原理、技术实现以及在工程应用中的实际意义,为同行在水源地或特殊功能区除藻技术的应用提供参考。 |
关键词: 加压上浮法 除藻技术 饮用水源地 蓝藻水华 |
DOI: |
分类号: |
基金项目:国家十一五水体污染控制与治理重大专项项目(2008ZX7101-014) |
|
Demonstration of Ascent by Applying Pressure Technique in Emergent Algal Removal in Source Water Areas |
WENG Jian-zhong, YANG Ji-de, XU Heng-xing
|
Suzhou Environmental Monitoring Central Station, Suzhou, Jiangsu 215004, China
|
Abstract: |
Algal removal technology is the most straightforward and effective way in reining in the stiff cyanobacteria Blooms situation in the Lake Taihu. The comparison was made of different algal removal technologies. The technique of Ascent by Applying Pressure was introduced with its use in algal removal technology demonstration project in the Lake YangCheng in Suzhou. The purpose is to provide source water areas or special functional zones with a reference in combating cyanobacteria Blooms pollution. |
Key words: method of ascent by applying pressure algal removal technology sources drinking water cyanobacteria bloom - forming |